Horizons Manufacturing System – Tables
HMS Setup
BOM50500 & 511 – HMS Setup window
BOM50501 – Install and Setup – holds HMS version information
BOM50502 – Notes
BOM50503 – Note Setup
BOM50504 – ECO Setup
BOM50505 & 506 – Table Conversion Window
BOM50508 & 509 – Generic Import Header and Detail
BOM50510 – Import GP BoM Setup
BOMACT – HMS User Activity Table
BOM50701 – Production Report Setup
BOM50405 – Quantity Inquiry
BOM50416 – MRP Multiple Location Setup
Bill of Materials
BOM50100 – Components
BOM50106 – Finished Goods
BOM50101 – Optional Components
BOM50103 – Indented BoM
BOM50104 – Manufacturer Parts
BOM50105 – Multiple Reference Designators
BOM50110 – Component Change Log
BOM50111 – Multi-Product Finished Goods Setup (MPP)
BOM50116 – Component Alternate Items
BOM50117 – Component Work Center Setup & Component Work Center Sequencing (for WIP)
BOM50119 – Component Alternate Options
BOM50120 – Component Alternate Types
Production
BOM50200 – Production Entry Header History – BOM50300
BOM50201 – Production Entry Components History - BOM50301
BOM50202 – Finished Good Distributions History - BOM50302
BOM50900 – Production Batches
BOM50203 – Serial/Lot Work History - BOM50303
BOM50204 – Serial Lot Header
BOM50205 – Production Labor, Overhead and Variance Distributions History - BOM50305
BOM50206 – Work In Process Components History - BOM50306
BOM50207 – WIP Transfer Log
BOM50209 – Linked Sales Orders
BOM50211 – Time Entry Records History - BOM50311
BOM50212 – Production Status Setup
BOM50213 to BOM50216 – Production Auto-Create SOP
BOM50217 – Multi-Product Finished Goods – Work and History (MPP)
BOM50218 – Overage Item Setup
BOM50219 – Cost Center Setup
BOM50220 – GL Reference Setup
BOM50222 – WIP Multiple Transfer-From Locations
BOM50226 – WIP Serial/Lot Select
BOM50227 – WIP Current Locations
BOM50229 – Disassemble Items
BOM50231 – Disassemble Serial/Lots
BOM50269 – HMS Item Allocations (MPP)
BOM50270 - HMS MPP Postback SL (MPP)
BOM50356 – Disassemble Bins
BOM50309 – Disassemble History
BOM50310 - Disassemble Serial/Lot History
BOM50233 – Production Subassembly Options
BOM50237 – WIP By-Products
BOM50245 – Production Multiple Reference Designators
BOM50246 – WIP Multiple Reference Designators
BOM50255 – Bin For WIP Issue
BOM50256 – Bin For Posting
BOM50304 – Serial/Lot Apply Work and History
BOM50307 – Lot History
BOM50308 – Serial/Lot Reject Work and History
BOM50312 – WIP Post-back Work and History
BOM50264 - HMS Fill Batch Detail
BOM50265 - HMS Split SerialLots
BOM50268 - HMS Split CpntQtys
Router & Shop Floor Control
BOM50126 – Non-Shop Floor Router and Time Entry Estimates
BOM50127 – Steps and detail for Non-Shop Floor Router and Time Entry Estimates
BOM50133 – Base & FG Router Header
BOM50122 – Base & FG Router Steps
BOM50113 – Work Center Setup
BOM50131 – Operation Setup
BOM50140 – Work Center Departments
BOM50175 – Reject Code Setup for Traveler Processing
BOM50240 – Production Traveler Header
BOM50241 – Production Traveler Steps
BOM50249 – Traveler Postings
BOM50250 – Production Traveler Step Scheduling Detail
BOM50253 – Traveler Postings Detail
BOM50257 – Traveler Transactions
BOM50314 – Traveler Transaction History
ECO
BOM50114 – ECO Master
BOM50115 – ECO BoM
BOM50152 – ECO Priorities
BOM50153 – ECO Linked Documents
BOM50154 – ECO Component Detail (ECO history of BOM50100)
BOM50155 – ECO Approvals
BOM50156 – ECO Disposition Setup
BOM50157 – ECO Approval User Setup
BOM50158 – Engineering Change Orders
BOM50159 – ECO Component Work Centers (History of BOM50117)
BOM50164 – ECO Detail – link between ECO Master and ECOs
BOM50166 – ECO Finished Goods (History of BOM50106)
BOM50190 – ECO Reference Designators
MRP
BOM50404 – MRP Purchasing Header
BOM50402 - MRP Purchasing Detail
BOM50406 – Scheduling Header
BOM50407 – Scheduling Detail
BOM50408 – Order Components
BOM50410 & 417 – Vendor Addon
BOM50415 – Purchase Posting Journal
BOM50422 – Purchase Posting Detail
BOM50424 – Planned Work Orders
BOM50425 – Planned Work Order Sources
BOM50426 – Schedule Sources
BOM50428 – MRP Processing Selected Work Orders
BOM50429 – Planned Work Order Parent Demand On Hand Applied